How to Hire a Condo Engineer: 4 Steps

How to Hire a Condo Engineer: 4 Steps

Hire condo engineerMake sure you actually need one, too

They don’t teach you how to hire an engineer in school. Indeed most folks have never had the occasion to hire an engineer or an architect in their whole life. This is also true for most condominium or HOA board members. So how does a condo board go about successfully hiring the right engineering firm for their upcoming project?

1. Evaluate the Need

Perhaps the first question to be asked is ‘do we even need an engineer?’ Not all projects do. Some repair projects are so straight forward and obvious the board can hire a contractor with the proper skills and run the project by a committee chair or a property manager who has expressed confidence she’s managed many similar repair projects. Some projects requiring some engineering expertise, such as replacing the common HVAC equipment or upgrading the common electrical systems, do not need an engineer to manage it but rather the right choice by the board would be to seek an HVAC or electrical contractor capable of providing ‘design/ build’ services for both a timely and economically satisfactory project.

The complexity of the project and criteria needed to be complied will determine whether an engineer is needed. Typical projects in this category will include designing a new storm water drainage system for the entire HOA; performing a reserve fund study; or evaluating and design of a new foundation for one or more buildings in the condo complex. It should be noted, the term ‘engineer’ in this article refers to a professional engineer (P.E.) licensed in the state of Maine. Though other unlicensed engineers can work on the project, only a licensed engineer can stamp (preliminary and final) construction documents for town planning board review; building permits; and other municipal requirements.

2. Selecting the Engineer

Once the need is determined, selecting an engineer is the next major step. The process starts with defining the project with a clear and complete description of the scope of work. Many property managers have the resources to provide considerable assistance to the board in developing this scope of work. While the scope of work is being prepared, a list of two or three engineering firm should be created. Clearly this list should be made up of engineering firms providing the services needed for the subject project. Here again the condo’s property manager can be a good source of finding the right firms. Similarly, engineers listed in the Condo Media’s directory can make this task relatively easy because the engineers listed will be firms with experience in not only the technical issues involved but also are familiar with the world of condominiums and their special needs.

3. Preparing the RFP

Once the potential list of firms is developed, a Request for Proposal (RFP) can be prepared. This document will utilized the defined scope of work to ensure all interested parties are preparing their responses with a similar understanding of the board’s objectives. Typical RFP’s have four major elements:

1) General Information for the Engineer
2) Technical Requirements
3) Criteria for Selection
4) Scope of Work Statement

On some projects it may necessary to invite the potential firms to visit the site for a tour to outline the issues or special conditions impossible to clearly delineate in the RFP. Following the distribution of the RFP to the listed firms, the board will screen the proposal responses; select firms it wishes to interview; and schedule the interviews (45 minutes to 1 hour) to allow both the engineering firm and the board to clarify any questions or concerns arising during the proposal preparation process.

4. The Interview and Contract Process

This interviewing process is most important. Typically, the principal or senior member of the engineering firm attends the interview giving the board a first-hand impression of the firm’s approach to this project; a clear commitment to the technical resources available for this project; and past relevant experience predicting a likely successful outcome. The interview also allows the engineering firm a better understanding of how the board will be making decisions and committing adequate representation to ensure proper administration of the project.

Following this interview the board should select it first choice for the project’s engineer. At that time the contract is negotiated. Often the contract is a direct reflection of the requirements of the RFP and the conditions and fee found in the engineering firm’s proposal. These negotiations on occasion will result in changes to the scope of work and the fee. If agreement cannot be reached on issues acceptable to the board, the board can begin discussions with their second engineering firm choice in order to feel comfortable with their selection. It is critical the board feels they have selected a firm they can work with and have confidence future communications and project outcome will meet their community’s needs.

Awarding the contract to the successful engineering firm is only the beginning. A kick-off meeting to introduce all of the project team members on both sides; a review of everyone’s obligations; and establish a clear line of authority and communications. In starting any major project, the board should always remember that just like dealing with a lawyer or a doctor, the engineer’s job is to provide competent technical information and solutions but it is the board’s responsibility to make the business’ decisions. History has shown a well- defined scope of work coupled with a board making timely decisions is a recipe for a successful project.

Article written by Jack Carr, P.E., R.S., LEED-AP, Criterium Engineers
Published in Condo Media January 2020 edition
Download a PDF Version of this Condo Media Article

Read more

Foundation Forensics

Crack in a foundationCracks in foundations are by far the most common structural complaint raised in either reserve fund studies or transition studies.   They can occur in the youngest or newest condo building. As condo documents usually assign the maintenance responsibility of their repair to the association, board members and property managers take them very seriously.  Missouri condo buildings have many types of foundations including concrete block; brick; and mortared stone with the most common being poured concrete.

Most basements and garages have 4 to 6 inch concrete slabs and unless this is a slab-on-grade foundation, the slabs were poured independently of the foundation walls.  They are said to be ‘floating’.  Often the construction joint between the slab and wall can easily be seen.  The common slab crack complaint is hairline cracks appearing in spider web-like patterns.  These cracks can show up shortly after construction and are normally caused by shrinkage during the curing process.  The key point here is this type of slab cracking is rarely a structural problem, for after all, the slab could be completely removed leaving a dirt floor while the foundation walls and columns with footings will easily maintain a stable building.

Therefore, slab cracking is often more of a cosmetic problem.  Cracks are often repaired with a variety of grout, caulk, or epoxy products primarily to prevent groundwater penetration, insect entry, or radon gas infiltration.  Cracks showing differential movement on opposing surfaces can be a tripping hazard but more importantly an indication of serious sub-surface conditions needing further investigation.

Regarding foundation walls, the most typical problem with concrete walls are vertical hairline cracks, often starting at the top of the wall and traveling down to the floor slab.  A sub-set of these types of cracks are those that propagate often in a diagonal direction from stress concentration points such as the bottom corners of basement window openings.  The key point to remember is these types of cracks, even when they penetrate the entire thickness of the wall, normally do not constitute a structural problem as the loads from above pass unobstructed on both sides of the crack to the footings below.

However, when the wall surfaces on both sides of the crack are moving out of plane or the structure above shows stress in the form of movement or cracking sheetrock walls and ceilings above, further structural evaluation is warranted.  Foundation cracks should be sealed if periodic water infiltration occurs.  Repairing cracks from the outside if often the best method, but due to the excavation costs involved, repairing the crack from the interior by injecting a crack filling material has become a routine solution.

When horizontal wall cracks; multiple closely spaced vertical cracks; or large diagonal cracks in basement corners are observed, these conditions may indicate more serious problems related to settlement or other structural problems.  Similarly, a single vertical crack that is much wider at the top of the wall may indicated foundation settlement problems stemming from poor soil conditions; hydrostatic groundwater pressures; or frost heaving.  These problems should be directed to a knowledgeable consultant.

Regarding concrete block foundation walls, most of the guidance above can be used with some exceptions.  By their nature concrete block walls are often not well reinforced and are subject to inward movement from various soil pressures causing these types of walls can bulge inward.  Ice lens forming about 3 feet below the ground surface can expand and push concrete block walls inward.  This can even occur from a vehicle’s weight being too close to the foundation, such as oil delivery truck.  When horizontal cracking is observed in block walls, steps should be taken quickly to prevent further movement.  These types of walls are also very susceptible to water penetration even when foundation drains are present often requiring serious water proofing repairs.

The key to maintaining a sound brick or concrete block foundation is periodic vigilance to ensure loose or dislocated masonry elements are not ignored.  If you observe a ‘stair step’ patten crack in the mortar joints of a masonry foundation wall, it typically means settlement has occurred under the ‘step’ section of the wall. .  Any observed bulges or horizontal movement, as well as new cracks, should be quickly addressed.

Many Missouri condominiums have been converted from old multi-family apartment buildings with mortared or un-mortared stone foundations, some with brick foundation walls above the ground surface.  These foundations have stood the test of time and are more than 100 years old and if well maintained can last another 100 years.  They are more likely to allow the entrance of ground water due to their porous nature and the necessary steps should be taken to protect the structural elements and indoor air quality of the building if high moisture is a problem.  Old foundations are like people.  As they age, they need some extra care but they have already met the test of time.

Read more

How Safe Is Your Deck?

May is National Deck Safety Month® and your spring maintenance checklist should include a thorough inspection of your deck and railings. It’s important to ensure their safety before the outdoor entertainment season begins with family gatherings and neighborhood barbecues taking place on your deck.

Here are a few items to consider as you check your deck:

  • Check Connections: make sure all railing connections are secure. Anchorage points for wood railings often rot and may fail. Perform a stress test by cautiously pushing on the railing to make sure it doesn’t give at any point.
  • Stair Railings: stairs with two or more stair risers should have a railing.
  • Guardrails (railings): are required on “open-sided walking surfaces” higher than 30 inches from the ground, including decks. On single family homes, guardrails must be 36 inches high for decks (measured from the deck surface to the top of the rail) and 34 inches for stairs, measured vertically from the tread nosing.
  • Strength & Spacing: both guardrails and handrails must be able to withstand at least 200 pounds of force applied at any point and in any direction. The balusters should withstand 50 pounds of pressure exerted over a one-square-foot area. Spaces between balusters cannot exceed 4 inches to prevent children from getting their heads stuck in the openings or falling through them.
  • Benches: a bench installed around the perimeter does not serve also as a guardrail. The bench may be the required distance from the ground (36 inches), but without a guardrail behind it, which both the building code and common sense require, there is nothing to prevent someone from toppling backwards off the deck.
  • Touchup with Paint: repaint or stain the wood, if necessary (the experts suggest at least every five years). Consider using paint with slip-resistant additives for the deck and stairway riser surfaces.

With regular inspections of handrails and guardrails, you can identify and correct problems before they become an accident you could have prevented. Ensuring that your deck, handrails and guardrails are safe will help to ensure the safety of all who use them from toddlers to seniors.

Related Resources:

  • Your Home – a Criterium Engineers publication “Stairways and Decks Aren’t Safe Unless their Railings are Secure.” This document outlines building code requirements for guardrails and handrails, as well as design elements that may cause problems such as rail height and benches along the perimeter.
  • The State of California has a new extensive law that went into effect January 1, 2019, requiring the inspection of Exterior Elevated Elements (Decks and Balconies) and waterproofing elements for buildings with 3 or more multifamily dwelling units. Information on this bill and its history may be found on CA.gov.
  • The North American Deck and Railing Association (NADRA) provides tools for consumers to Check Your Deck® for the upcoming season.

Note: these resources are provided for consumer guidance only. To have a licensed, Professional Engineer inspect your deck, contact Criterium-Hardy Engineers.

Read more

The Advantage of Using a Licensed Engineer for Home Inspection

Contact Criterium-Hardy for your Home Inspection Needs!Home Inspection is a critical process – you need an expert on your side!  The term “home inspector” can be a self-issued title. In the state of Missouri, any person can claim to be a home inspector and perform a home inspection. It is up to the buyer to seek out a home inspector with qualifications you can trust.

One important qualification is to make sure your home inspection is completed by an inspector that belongs to a professional organization such as ASHI, American Society of Home Inspectors. Organizations such as ASHI require inspectors to meet experience-based criteria and adhere to a set of standards during the inspection process. However, if you are looking for an inspector with the most in-depth experience and knowledge of major systems, structures, etc. you should look to hire a home inspector who is also a licensed professional engineer (a.k.a. P.E. or Professional Engineer.)

Professional Engineers not only have a Bachelor of Science degree in Engineering, but also have been registered by the Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Landscape Architects. An ASHI certified home inspector is qualified to find the symptoms that a house presents, but many times they will suggest the consulting services of a Professional Engineer for further evaluation and problem resolution. This can be an expensive and time consuming addition to the home inspection process. Hiring a home inspector who is a licensed engineer can save you the additional fees of consulting that may be necessary. It will also give you the peace of mind that you are getting the MOST professional advice that is available. Hiring a licensed professional engineer to perform home inspections can ultimately save you time and money.

We provide comprehensive home inspection and other residential engineering services!

Read more